OUR WORK. IN DETAIL.
Textile Industry Parks Waste Water Treatment Project – Ethiopia
Project Details: 23 tanks for 3 textile industrial parks WWTP at Adama, Dire Dawa and Addis Ababa1 set of tank: 12.234.8m 1 set of tank: 19.876.0m1 set of tank: 23.697.2m 2 sets of tank: 25.224.8m3 sets of tank: 24.466.…
Explore the project01 / THE PROJECT
From a closer perspective.
A closer look at the work, its context and the details behind the project.
Project Details: 23 tanks for 3 textile industrial parks WWTP at Adama, Dire Dawa and Addis Ababa
1 set of tank: 12.234.8m 1 set of tank: 19.876.0m
1 set of tank: 23.697.2m 2 sets of tank: 25.224.8m
3 sets of tank: 24.466.0m 1 set of tank: 19.116.0m
1 set of tank: 8.414.2m 2 set of tank: 6.883.6m
1 set of tank: 13.766.0m 2 sets of tank: 28.287.2m
5 set of tank: 3.823.6m 1 set of tank: 17.586.0m
1 set of tank: 4.593.6m 1 set of tank: 6.883.6m
Roof type: aluminum alloy roofs
Installation started since June, 2018
02 / IN THE FRAME
Every detail, in view.
A closer look at the workSelect a photo to explore
LET’S BUILD WHAT’S NEXT
The right solution starts with a conversation.
Tell us about your site, application and requirements. Let’s find the right approach together.


