OUR WORK. IN DETAIL.
Palm oil Wastewater Treatment Plant – Sandakan Malaysia
Project Details:5 sets of Anaerobic fermentation tanks:Ø 18.33×8.4MRoof type : enamel roofInstallation Finished on 2012
Explore the project01 / THE PROJECT
From a closer perspective.
A closer look at the work, its context and the details behind the project.
Project Details:
5 sets of Anaerobic fermentation tanks:Ø 18.33×8.4M
Roof type : enamel roof
Installation Finished on 2012
02 / IN THE FRAME
Every detail, in view.
A closer look at the workSelect a photo to explore
LET’S BUILD WHAT’S NEXT
The right solution starts with a conversation.
Tell us about your site, application and requirements. Let’s find the right approach together.


