Project Details3 sets of wastewater treatment tanksTank Size: 2 units Φ18.338.4 M, glass fused to steel roof 1 unit Ø 20.387.2M, open roofInstallation finished: 2013

Explore the project
Project illustration

01 / THE PROJECT

From a closer perspective.

A closer look at the work, its context and the details behind the project.

Project Details
3 sets of wastewater treatment tanks
Tank Size: 2 units Φ18.338.4 M, glass fused to steel roof 1 unit Ø 20.387.2M, open roof
Installation finished: 2013