OUR WORK. IN DETAIL.
Indonesia Palm Oil Wastewater treatment project
Project Details3 sets of wastewater treatment tanksTank Size: 2 units Φ18.338.4 M, glass fused to steel roof 1 unit Ø 20.387.2M, open roofInstallation finished: 2013
Explore the project01 / THE PROJECT
From a closer perspective.
A closer look at the work, its context and the details behind the project.
Project Details
3 sets of wastewater treatment tanks
Tank Size: 2 units Φ18.338.4 M, glass fused to steel roof 1 unit Ø 20.387.2M, open roof
Installation finished: 2013
02 / IN THE FRAME
Every detail, in view.
A closer look at the workSelect a photo to explore
LET’S BUILD WHAT’S NEXT
The right solution starts with a conversation.
Tell us about your site, application and requirements. Let’s find the right approach together.


