Heineken Plant Wastewater treatment tanks – East Timor
Project Details:Sedimentation tank: 4.2×4.2MPretreatment tank: 8.4×4.2 MAdjusting tank : 8.4×4.2MHydrolytic acidification tank: 8*9MSludge-tank: 3.8×4.2MAerobic tank : 12.99×4.2MInstallation finished: November 2016
Explore the project01 / THE PROJECT
From a closer perspective.
A closer look at the work, its context and the details behind the project.
Project Details:
Sedimentation tank: 4.2×4.2M
Pretreatment tank: 8.4×4.2 M
Adjusting tank : 8.4×4.2M
Hydrolytic acidification tank: 8*9M
Sludge-tank: 3.8×4.2M
Aerobic tank : 12.99×4.2M
Installation finished: November 2016