OUR WORK. IN DETAIL.

Coco-Cola Plant Wastewater Treatment

Bandar Enstek, Seremban, Malaysia Project Details:EGSB tank with enamel roof: 7.6417.4M Adjusting tank with aluminum deck roof :9.1716.8MInstallation finished: October 2016

Explore the project
Project illustration

01 / THE PROJECT

From a closer perspective.

A closer look at the work, its context and the details behind the project.

  • Bandar Enstek, Seremban, Malaysia
Project Details:
EGSB tank with enamel roof: 7.6417.4M Adjusting tank with aluminum deck roof :9.1716.8M
Installation finished: October 2016

LET’S BUILD WHAT’S NEXT

The right solution starts with a conversation.

Tell us about your site, application and requirements. Let’s find the right approach together.

Discuss your project