OUR WORK. IN DETAIL.

AB InBev WWTP Project – Mozambique

Equalization tank: Ø 15.297.2M Buffer tank: Ø9.174.8MCalamity tank: Ø8.46.6M Anoxic Tank Ø4.597.2MAeration Tank:Ø15.297.2M MBR permeate tank:Ø4.593.6MSludge Tank:Ø7.643.6M UASB tank:Ø19.879MRoof type: GFS roof or Alumin…

Explore the project
01 / 01AB InBev WWTP Project – Mozambique

01 / THE PROJECT

From a closer perspective.

A closer look at the work, its context and the details behind the project.

Equalization tank: Ø 15.297.2M Buffer tank: Ø9.174.8M
Calamity tank: Ø8.46.6M Anoxic Tank Ø4.597.2M
Aeration Tank:Ø15.297.2M MBR permeate tank:Ø4.593.6M
Sludge Tank:Ø7.643.6M UASB tank:Ø19.879M
Roof type: GFS roof or Aluminum alloy roofs
Installation finished since October, 2019

LET’S BUILD WHAT’S NEXT

The right solution starts with a conversation.

Tell us about your site, application and requirements. Let’s find the right approach together.

Discuss your project